Best west point bridge design 2016

broken image

5,907 of these teams submitted 24,184 unique bridge designs to the contest website for judging.

broken image

During this period, 8,101 teams registered for the contest and used the West Point Bridge Designer 2015 to design an amazing variety of bridges. The Qualifying Round of the Engineering Encounters Bridge Design Contest was conducted from January 12 through April 24, 2015.

broken image

All semi-final bridge costs are posted on our Semi-Final Scoreboard.Ĭongratulations to our six finalist teams! Rank The winning semi-final design, submitted by Team Tiger from Middletown, NJ is shown at right. The official results of the Semi-Final Round (with consolidated high school and middle school standings) are shown below. During this period, 72 teams used the Bridge Designer 2015 to create new bridge designs, based on a unique semi-final project scenario.

broken image

The Semi-Final Round of the Engineering Encounters Bridge Design Contest was conducted on May 15, 2015, from 1:00 to 3:00 pm EDT.

broken image